To address the development design of level
extension for mining the No. 3-1 coal seam at Level II in Cuncaita Coal Mine,
Based on constraints including geological conditions, existing development
layout, and production system connectivity, research was carried out on the
design of the second-level extension and production system optimization. First,
the current state of the mine development layout and production system was
analyzed from the aspects of industrial site arrangement, development method,
transportation system, ventilation system, and drainage system. Second, the
design of the second-level extension was determined by analyzing the extension
development method, level division and elevation, main roadway layout, panel
division, and layout of the first working face. Finally, the production system
for the second level was optimized in terms of main(auxiliary) transportation
system, ventilation system, and drainage system, achieving effective
integration with the mine’ s existing production system. The results show that through reasonable
extension development layout and scientific production system optimization, the
second-level extension design of Cuncaita Coal Mine effectively improves the
utilization rate of existing production systems and facilities, avoids impacts
on mine production during extension construction, and can provide a scientific
reference for level extension design in mines with subhorizontal coal seam
groups.